BLÜCHER® Helps Keep Birmingham Gateway Moving
Stainless steel piping worth 10 x the height of the Shard was supplied for Gateway New Street
Share this Case Study
Industry
Transportation
Category
Product(s) Installed:
Customer
Birmingham Gateway New Street Railway
Location
Birmingham, England
Scope
Supply around 10,000 feet of environmentally-friendly, corrosion-resistant piping.
What Client Needed
A sustainable, non-toxic, labour-saving, and fire-resistant piping system.
Solution
3,090 Metres of BLÜCHER® EuroPipe
Result (ROI)
BLÜCHER® EuroPipe drainage pipework system supplied for the facade and throughout the building.