BLÜCHER® Helps Keep Birmingham Gateway Moving

Stainless steel piping worth 10 x the height of the Shard was supplied for Gateway New Street

BLUCHER_europipe_typemark_sq

Share this Case Study

Industry

Transportation

Category

Product(s) Installed:

Customer

Birmingham Gateway New Street Railway

Location

Birmingham, England

Scope

Supply around 10,000 feet of environmentally-friendly, corrosion-resistant piping.

What Client Needed

A sustainable, non-toxic, labour-saving, and fire-resistant piping system.

Solution

3,090 Metres of BLÜCHER® EuroPipe

Result (ROI)

BLÜCHER® EuroPipe drainage pipework system supplied for the facade and throughout the building.