Save Time with BLÜCHER® EuroPipe
Postens Terminal Berger's complete roof drainage system installed in just 800 labour hours instead of 2000
Share this Case Study
Industry
Manufacturing & Industrial,
Other Industries
Category
Product(s) Installed:
Customer
A large storage hotel
Location
Bergen, Norway
Scope
Supply piping for an area of around 42,000 m2
What Client Needed
Long-lasting piping and roof drainage system that could be installed in roughly 1,000 labour hours.
Solution
BLÜCHER® EuroPipe
Result (ROI)
Roof drainage system with an estimated 2,500 m of pipes connected to ca 120 roof drains installed in just 800 labour hours.
Partner(s)
Bulk Eiendom AS and Aug Larsen AS (Bravida Norge AS)
Torstein RøsholtProduct ResponsibleBLÜCHER Norway“The EuroPipe-pipes are much lighter, so they can be handled by just one person. That saved us a lot of heavy lifting and made it possible for us to work more efficiently.”